Uttarakhand
Skill Mapping Draft – III A

by

Office of DC-MSME
Ministry of MSME

This document has been prepared by Office of DC-MSME and its field offices in consultation with Industry Associations and Clusters


This is the third draft after Consultation with State Government and validation
by district level Industry Associations

District-wise Skill Development needs for the Pithoragarh, Uttarakhand
     S.No.   Name of MSME–DI    Name of District    Name of Industry Cluster    Product of the Cluster    Skill Development need as per the products  Name of the suggested Training Programme including duration Nos. Of Institution capable of suggested training programme in the district  Total training capacity of these training institute  annually Total capacity of clusters to give employment to trained persons    List of Degree Engineering college List of Polytechnics
Name Govt/  Pvt. Course Intake Machinery available Name Govt/  Pvt. Course Intake Machinery available
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1 HALDWANI Pithoragarh I) Manufacturing of woolen carpets (Small) Carpet Technological intervention in pre loom, on loom and quality control  Training on Pre-loom and on loom,.  -  - 2-8*           GOVERNMENT POLYTECHNIC KANALICHHINA GOVT EE 40 pUrchase of machine under process
2 II) Mfg. Of Weaving apparel dressing & dyeing of fur (Small) Readymade Garments Stitching, cutting, Pattern making, Designing, Quality Control Training for sewing Machines operator, cutting, Pattern making testing and quality control  -  - 2 – 8*           GOVT. POLYTECHNIC GANAI GANGOLI GOVT EE/ IT/ ME 40 Basic electronics, Lathe, Grinding, Shapper machine, wood working
3 III) Mfg of Food products/ Beverages (Small) Bakery & Fruit & Vegetable Products Bakery & Fruit & Vegetable Products
Need of skill upgradation programme, quality assurance, processing of food & vegetables & bakery products & packaging, food safety measures
6 weeks ESDP on Food products  -  - 2 – 8*                    
4 Pithoragarh Floor Covering Floor Covering designing,Skill Development SDP 4 weeks  -  - 3 – 8*                    
5 Pithoragarh Jewellery  -do-  -do-  -  - 2 – 8*                    
6 Pithoragarh Metalware  -do-  -do-  -  - 2 – 8*                    
7 Munsayari Carpets & Durries  -do-  -do-  -  - 2 – 8*                    
8 Pithoragarh Woolen wrap  -do-  -do-  -  - 2 – 8*                    
9 Didihat Carpets & Durries  -do-  -do-  -  - 2 – 8*                    
10 Pithoragarh Saree, bed sheet, shawl, blanket, durries, gamcha, loi etc.  -do-  -do-  -  - 2 – 8*