Uttarakhand Skill Mapping Draft – III A by Office of DC-MSME Ministry of MSME This document has been prepared by Office of DC-MSME and its field offices in consultation with Industry Associations and Clusters This is the third draft after Consultation with State Government and validation by district level Industry Associations |
|||||||||||||||||||||
District-wise Skill Development needs for the Haridwar,Uttarakhand | |||||||||||||||||||||
S.No. | Name of MSME–DI | Name of District | Name of Industry Cluster | Product of the Cluster | Skill Development need as per the products | Name of the suggested Training Programme including duration | Nos. Of Institution capable of suggested training programme in the district | Total training capacity of these training institute annually | Total capacity of clusters to give employment to trained persons | List of Degree Engineering college | List of Polytechnics | ||||||||||
Name | Govt/ Pvt. | Course | Intake | Machinery available | Name | Govt/ Pvt. | Course | Intake | Machinery available | ||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | ||
1 | HALDWANI | HARIDWAR | I) Surveying Instrument Industry (small) | Surveying Instruments | Lean manufacturing. | one day intensive training programme (Lean manufacturing) | 1) 40 nos. | 2-8* | BALWANT SINGH MUKHIYA ( BSM) COLLEGE OF ENGINEERING | PVT | EE/ ME/ CE/ CSE | 60 EACH | Annexure 5 | BALWANT SINGH MUKHIYA(BSM) COLLEGE OF POLYTECHNIC | PVT | AE/ CE/ CSE/ EE/ ME | 60 EACH | Annexure 5 | |||
2 | II) Pharmaceuticals cluster (small) | Medicine & related products | Quality & marketing
aspects GMP Compliances Packaging Export documentation |
One day intensive training programme (quality & management) | 1) IIT, Roorkee, Haridwar | 2-8* | BISHAMBER SAHAI INSTITUTE OF TECHNOLOGY | PVT | CE/ EE/ ECE/ IT/ ME | 60/ 60/ 60/ 60120 | Annexure 5 | BISHAMBER SAHAI DIPLOMA ENGINEERING COLLEGE | PVT | AE/ CE/ COE/ EE/ ME/ PE | 60/ 120/ 60/ 120/ 60/ 60 | Annexure 5 | |||||
3 | III) Electrical units (small) | Electrical products | Quality & marketing aspects of electrical items | 2 weeks EDP(Quality/ Marketing) | 2-8* | COER SCHOOL OF MANAGEMENT | PVT | MCA | 60 | Computer, Printer, CD Writer, Scanner, Web Cam, Hub, UPS | COLLEGE OF ADVANCED TECHNOLOGY | PVT | CE/ EE/ ELECTRONICS/ ME(AUTO)/ ME/ PROD) | 120/ 60/ 60/ 60/ 120 | All labs are equipped with latest equipments. | ||||||
· Using Electrical testing instruments, calibration & testing of Instruments | COLLEGE OF ENGINEERING ROORKEE | PVT | AEAIE/ CE/ CSE/ EEE/ ETE/ IT/ ME/ PPE | 60/ 120/ 138/ 120/ 120/ 90/ 138/ 60 | Material Science Lab Machine
Drawing Lab Fluid Mechanics Lab Manufacturing Science Lab Thermodynamics Lab Control System Lab Machine and Design Lab Het and Mass Transfer Lab Refrigeration & Air Conditioning Lab Project Lab, facilities for carrying out various tests on all building materials, Soil and Waters samples, Computer Finite Element Analysis (FEA) Failure analysis |
IMS INSTITUTE OF TECHNOLOGY ROORKEE | PVT | CE/ EE/ ME/ ME(AUTO) | 120/ 120/ 120/ 60 | All labs are equipped with latest equipments. | |||||||||||
· Design, construction, operation, testing(Including High voltage testing) of Electrical components | GSBA ENGINEERING, PHARMACY AND MANAGEMENT INSTITUTE | PVT | CE/ CSE/ ECE/ EEE/ IEAM/ ME | 60 EACH | All labs are equipped with latest equipments. | INSTITUTE OF PROFESSIONAL STUDIES | PVT | CE/ CSE/ EE/ ME/ ME(AUTO) | 120/ 60/ 120/ 120/ 60 | All labs are equipped with latest equipments. | |||||||||||
· Evaluation of solid Insulation material | GURUKULA KANGRI VISHWAVIDYALAYA HARIDWAR | PVT | ECE/ CSE/ ME/ CE | 60 EACH | All labs are equipped with latest equipments | K.L. POLYTECHNIC | PVT | CE/ EE/ ECE/ ME(AUTO)/ ME(PROD)/ DIPLOMA coa | 60/ 60/ 60/ 40/ 60/ 60 | Lathe, Power Hacksaw, Drill machine, wood turning, welding machine , arc welding, floor grinding, CNC, UTU Machine, grinder, civil equipments, electronics equipments | |||||||||||
District-wise Skill Development needs for the Haridwar,Uttarakhand | |||||||||||||||||||||
S.No. | Name of MSME–DI | Name of District | Name of Industry Cluster | Product of the Cluster | Skill Development need as per the products | Name of the suggested Training Programme including duration | Nos. Of Institution capable of suggested training programme in the district | Total training capacity of these training institute annually | Total capacity of clusters to give employment to trained persons | List of Degree Engineering college | List of Polytechnics | ||||||||||
Name | Govt/ Pvt. | Course | Intake | Machinery available | Name | Govt/ Pvt. | Course | Intake | Machinery available | ||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | ||
· Evaluation, Repair & servicing of Electrical components(Including testing using computer software) | INSTITUTE OF MANAGEMENT STUDIES, ROORKEE | PVT | MCA | 60 | equipped with state-of-art Networking technology, having 145 computers with latest Pentium IV Processor. The computer center has got licensed software Windows XP/ NT, Antivirus, Tally, Visual Basic, Visual Java, MS Office, Page Maker, Coral Draw, C & C++. Computer center is equipped with adequate number of Dot Matrix, Desk Jet & Laser Printers. Computer center consists of client-server Architecture and high-speed multi-services enable INTERNET / IP | MOTHERHOOD INSTITUTE OF MANAGEMENT AND TECHNOLOGY | PVT | CE/ EE/ ME(AUTO)/ ME(PROD) | 120/ 180/ 60/ 180 | All labs are equipped with latest equipments. | |||||||||||
· Design &Manufacturing of Mechanical Components, , Jigs & Fixtures, Die Casting dies & Sheet-Metal components . | INSTITUTE OF TECHNOLOGY ROORKEE (ITR) | PVT | CE/ CSE/ EEE/ ECE/ IT/ ME | 60/ 78/ 60/ 60/ 60/ 60 | All labs are equipped with latest equipments. | OM INSTITUTE OF TECHNOLOGY | PVT | CE/ CSE/ DIPLOMA IN ME/ EE/ ECE | 60 EACH | All labs are equipped with latest equipments. | |||||||||||
4 | Haridwar Pharmaceuticals | Pharmaceuticals | Desing, Skill Development | SDP 4 weeks | 2 | 100 | 50 | ||||||||||||||
5 | Roorkee Survey Instruments | Survey Instruments | -do- | -do- | 2 | 150 | 100 | ||||||||||||||
6 | Haridwar | Jewellery | -do- | -do- | 2 | 100 | 150 | ||||||||||||||
7 | Haridwar | Carpets & Durries | -do- | -do- | 2 | 120 | 85 | ||||||||||||||
8 | Haridwar | Theatre, Costumes & Puppets | -do- | -do- | 2 | 100 | 150 | ||||||||||||||
9 | Haridwar | Wood Turning & Lacquerware | -do- | -do- | 3 | 150 | 300 | ||||||||||||||
District-wise Skill Development needs for the Haridwar,Uttarakhand | |||||||||||||||||||||
S.No. | Name of MSME–DI | Name of District | Name of Industry Cluster | Product of the Cluster | Skill Development need as per the products | Name of the suggested Training Programme including duration | Nos. Of Institution capable of suggested training programme in the district | Total training capacity of these training institute annually | Total capacity of clusters to give employment to trained persons | List of Degree Engineering college | List of Polytechnics | ||||||||||
Name | Govt/ Pvt. | Course | Intake | Machinery available | Name | Govt/ Pvt. | Course | Intake | Machinery available | ||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | ||
· Evaluation of Cables & accessories(Switches, plugs, sockets) | WALI GRAMODYOG VIKAS SANSTHAN'S GROUP OF INSTITUTIONS | PVT | CE/ CSE/ IT/ MCA/ ME | 120/ 60/ 60/ 60/ 60 | All labs are equipped with latest equipments. | QUANTUM SCHOOL OF TECHNOLOGY | PVT | AE/ CHE.E/ CE/ CSE/ DC/ EEE/ EE/ IT/ ECE/ MANU. PROD./ ME/ MECHROT/ PETRO. E/ | 60/ 60/ 180/ 180/ 18/ 60/ 120/ 60/ 120/ 18/ 180/ / 60/ 180 | All labs are equipped with latest equipments. | |||||||||||
· Shielding of EMC/ EMI and compliance | ROORKEE COLLEG EOF ENGINEERING | PVT | AE/ CE/ CS/ CSE/ EEE/ ECE/ ME/ PETRO. E. | 60/ 180/ 24/ 84/ 120/ 168/ 240/ 60 | All labs are equipped with latest equipments. | ||||||||||||||||
· Safety testing & reliability testing & environment testing for Electrical Components | ROORKEE COLLEGE OF POLYTECHNIC ROORKEE. | PVT | CE/ CE (CONST)/ ECE/ CSE/ ME/ ME(PROD) | 60 EACH | All labs are equipped with latest equipments. | ||||||||||||||||
· MS office, web designing, E-Governance, E-procurement, E- Business etc. | ROORKEE INSTITUTE OF TECHNOLOGY | PVT | CE/ CSE/ EEE/ EE/ ECE/ MCA/ ME/ PROD. E/ STRUCTURAL E | 180/ 120/ 60/ 84/ 60/ 60/ 240/ 24/ 18 | All labs are equipped with latest equipments. | ||||||||||||||||
SHAKAMBHARI INSTITUTE OF HIGHER EDUCATION & TECHNOLOGY | PVT | AE/ CE/ CSE/ EE/ FD/ ME(AUTO)/ ME(PROD) | 60 EACH | All labs are equipped with latest equipments. | |||||||||||||||||
SWAMI DARSHNANANDA INSTITUTE OF MANAGEMENT AND TECHNOLOGY POLYTECHNIC | PVT | CE/ CS/ EE/ ME | 60/ 60/ 120/ 60 | All labs are equipped with latest equipments. | |||||||||||||||||
UTTARATECH POLYTECHNIC | PVT | CE/ EE/ ECE/ ME(AUTO)/ ME(PROD) | 60 EACH | All labs are equipped with latest equipments. | |||||||||||||||||
WALI GRAMODYOG VIKAS SANSTHAN'S GROUP OF INSTITUTIONS | PVT | CE/ CSE/ IT/ MCA/ ME | 120/ 60/ 60/ 60/ 602 | All labs are equipped with latest equipments. |