Haryana Skill Mapping Draft – III A by Shri Amarendra Sinha Special Secretary & Development Commissioner Ministry of MSME This document has been prepared by Office of DC-MSME and its field offices in consultation with Industry Associations and Clusters This is the third draft after Consultation with State Government and validation by district level Industry Associations |
||||||||||||||
District-wise Skill Development needs for the District Bhiwani, Haryana | ||||||||||||||
S.No. | Name of MSME–DI | Name of District | Name of Industry Cluster | Product of the Cluster | Skill Development need as per the products | Name of the suggested Training Programme including duration | Nos. Of Institution capable of suggested training programme in the district | Total training capacity of these training institute annually | Total capacity of clusters to give employment to trained persons | List of Degree Engineering college | ||||
Name | Govt/ Pvt. | Course | Intake | Machinery available | ||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 |
1 | Karnal | Bhiwani | Surgical and medical equipments manufacturers Cluster, Size: large | Surgical Operation Table and Light etc. | Machining, fitter, pipe cutting and bending, heat treatment, Powder coating and Painting | i) Machining ii) Fitter, pipe cutting and bending iii) Heat treatment iv) Powder Coating and Painting (Duration of the programme - (6 - 12 weeks) | 3 nos. | 250 nos. | 150 nos. | BHIWANI INSTT OF TECH. & SCIENCE,BHIWANI | PVT | CE/CSE/ECE/ME/EE/IT | 60/60/60/120/60/60 | Conventional m/cs like Lathe, Milling,Shaping,Boring,Slotting, Drilling,Broaching, Hobbing,Agriculture m/c,Food Processing Lab,Powder coating m/c, EDM,3D Coordinate Measuring m/c,Profile Projector,Models of Cold Storage, Ice Plant, Refrigeration,Hydraulic Bench,Torsion testing m/c,Steam Boilers,Impact testing m/c,Working model of Diesel & Petrol Engine,Solar Refrigeration system, Tool Maker Microscope,Metallurgical Microscope,Surface Roughness Tester,Muffle Furnace,Profile Projector,Autocollimeter, Height Master, Ignition system of a car,CNC Trainer Lathe, CNC Milling Trainer,CNC Injection Moulding M/c, Rigid PVC Pipe Plant,Powder Coating m/c,Fatigue Testing m/c,Creep Testing m/c,Centrifugal separator,Vacuum Forming m/c,Automatic Blow Moulding m/c,CAD Workstation |
2 | Bhiwani | Non-woven Cloth and Plastic Multi Product manufacturers Cluster, Size: Large | Non-woven bags and Plastic Products | Manufacturing of non-woven cloths, chemical testing of plastic products | i) weaving of Non-woven cloths ii) Chemical testing of Plastic products (Duration of the programme - (6 - 12 weeks) | 2 nos. | 200 nos. | 75 nos. | BRCM COLLEGE OF ENGG. & TECH, BAHAL DISTT BHIWANI | PVT | CE/CSE/EEE/ECE/ME/IT | 120/120/120/60/120/60 | -do- | |
3 | Bhiwani Shoe Liner | Footwear | Designing, packaging & Skill development | SDP 4-6 weeks | 2 | 150 | 100 | Institute of Technology & Sciences, Bhiwani Rohtak Road, Bhiwani | PVT | CE/CSE/EE/ECE/IT/ME | 60/60/60/120/60/120 | -do- | ||
4 | Bhiwani Stone Crushing | Stone | -do- | -do- | 2 | 150 | 100 | Technological Institute of Textile & Sciences,Birla Colony, Bhiwani | PVT | CSE/ECE/Elec & Comm. Engg/Elxt. & Instru. Engg/Fashion & apparel Engg/IT/Textile Chemistry/Tectile Chemistry & Textile Tech. | 60/60/30/60/60/50/70 | -do- | ||
5 | Bhiwani Powerloom Textiles | Textiles | -do- | -do- | 2 | 150 | 100 | Krishna Vidyapeeth of Management and Technology, Vill Khera(siwani), distt Bhiwani | PVT | CSE/ECE/ME/EEE/CE | 60 each | -do- | ||
6 | Bhiwani | Wooden beads | -do- | -do- | 2 | 150 | 100 | |||||||
7 | Charkhi-Dadri | Embroidery | -do- | -do- | 2 | 150 | 100 | |||||||
8 | Bhiwani | Dhoti, saree, dress material, long cloth, blanket, duster, towel, bed | -do- | -do- | 2 | 150 | 100 | |||||||
9 | Bhiwani | Wooden Beads | -do- | -do- | 2 | 150 | 100 |