Assam
Skill Mapping Draft – III

by

Shri Amarendra Sinha
Special Secretary & Development Commissioner
Ministry of MSME

This document has been prepared by Office of DC-MSME and its field offices in consultation with Industry Associations and Clusters


This is the third draft for Consultation with State Government and validation
by district level Industry Associations



District-wise Skill Development needs for the District Kamrup Metro, Assam
     S.No.    Name of MSME–DI    Name of District    Name of Industry Cluster    Product of the Cluster    Skill Development need as per the products  Name of the suggested Training Programme including duration Nos. Of Institution capable of suggested training programme in the district  Total training capacity of these training institute  annually Total capacity of clusters to give employment to trained persons    List of Degree Engineering college List of Polytechnics
Name Govt/ Pvt. Course Intake Mahinery available Name Govt/ Pvt. Course Intake Mahinery available
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1 Guwahati Kamrup Metro Drugs & Pharmaceuticals, Guwahati (Small) Allopathic &Ayurvedic Drugs Capacity Building of Cluster Improvement of production/ Processing/ Packaging Process 1. Quality Control as per GMP Guidelines          2. Improvement of production Process              3. Testing of Products &Handiling of  Apperatus(1 Month each) 14
02
(University)
04
( Engg. College)
02
(Polytechnic)
 02
(ITI)
01
Cane & Bamboo Trg. Centre 01
( Assam Textile Institute)
01
( Indian Institute of Handloom Technology) 01
( Weaver Service centre)
20            (Approx.) 20           (Approx.) ASSAM ENGINEERING COLLEGE Govt. Chem. E/  CE/  EE/  ME/  CSE/  E&TCE/  IPE/  Ins. E/  MCA 68/  138/  116/  86/  20/  60/  20/  20/  30 Annexure 11 ASSAM TEXTILE INSTITUTE Govt. Fashion T./  Garment T/  Textile T. 20/  20/ 30 Annexure 11
GIRIJANANDA CHOWDHURY INSTITUTE OF MANAGEMENT AND TECHNOLOGY Pvt. CSE/  ECE/  IACE/  AEIE/  CE/  EE/  IT/  ME/  MCA 78/  138/  18/  60/  60/  60/  60/  120/  60 Annexure 11 INDIAN INSTITUTE OF HANDLOOM TECHNOLOGY GUWAHATI Govt. HANDLOOM & TEXTILE TECH. 60  
GYAN SAGAR FOUNDATION GROUP OF INSTITUTIONS Pvt. Arch./  CE/  ME/  AEIE/  CSE/  EE/  E&TCE 80/  144/  144/  60/  60/  60/  60 Annexure 11          
2 Plastic Products, Guwahati (Medium) Different Plastic Products Capacity Building of Cluster Quality control 1. Technology Upgradation        2. Product Design   3. Mould Design          (1 Month each) -do- 40               (Approx.) 40               (Approx.) NERIM (NORTH EASTERN REGIONAL INSTITUTE OF MANAGEMENT) GUWAHATI Pvt. MCA 60            
3 Steel Furniture, Guwahati (Medium) Steel fabrication Fabrication /  Design /  Drawing /  Welding /  Fitting /  Painting /  Assembly /  Quality Control Skill development Programme  on  Steel Fabrication (1 Month) -do- 60               (Approx.) 60              (Approx.)